AI construction drawing review platform that finds clashes, missing details, and coordination risks before they become RFIs and rework
Stage
MVP
Not given
Founded
Not given
Not given
Based in
Not given
CA
Pricing model
Freemium
Paid
Pricing
Free tier: one image generation after email verification with watermark. Paid plans: Pro ($4.90/mo or $58.80/yr with 200 credits/month), Pro+ ($9.90/mo or $118.80/yr with 500 credits/month), Max ($29.90/mo or $358.80/yr with 1,800 credits/month). Credits start at $0.0166 each.
Free: 1 full project scan included. Starter: $499 CAD/month (2 full scans/month). Pro: $1,499 CAD/month (10 full scans/month). Enterprise: Custom pricing. Yearly billing saves 20%.
Key features
Text-to-image generation
Multiple AI model support
Credit-based pricing system
Transparent model costs
Free tier with watermark
Image-to-video workflow
Prompt inspiration library
Permanent history for paid users
Full drawing package review across architectural, structural and trade drawings
Multi-discipline clash detection between building systems
Cross-sheet consistency checks for contradictions and mismatches
Missing detail and specification gap detection
RFI-ready report generation with visual evidence
Revision comparison to detect changes between drawing versions
Scope obligation tracking for delegated-design notes
13 construction discipline coverage including architectural, structural, MEP and specialty trades
Integrations with Procore and Autodesk Construction Cloud
What makes it different
Unified interface for multiple models without switching accounts
Transparent pricing with no hidden fees
Independent platform not affiliated with model providers
Fast and free image generation option for speed, premium for quality
Evidence-backed findings with exact drawing references and visual proof instead of black-box AI recommendations
Reviews full drawing packages across all disciplines simultaneously, not individual sheets
Scope obligation tracking to identify unpriced work before contracts are awarded
Catches coordination problems before construction begins, reducing field delays and change orders